Pipeline Workshops™: Come. Participate. Learn.

In the weeks leading up to a Pipeline workshop™, we explain to attendees what they are about to experience.  We describe the tools that they will have to learn to use, the facts of the business case they will have to confront.  We forecast the take-aways, the knowledge, the enhanced capabilities.

We explain the challenging, disruptive, competitive nature of the learning – the degree of interaction, the level of intensity – they will experience.

At a Pipeline workshop™, it is learn-by-doing, applying production principles and disciplines to production simulation, and measuring the resulting operating performance and economic return.  We communicate our expectation that builders come prepared to learn that way, that there is no place to hide, that they need to check their sense of entitlement at the door.

Nevertheless, most attendees acknowledge afterward they should have studied more, prepared harder, in advance of the workshop.

We make no apologies for the extraordinarily demanding nature of a Pipeline workshop™.  It is intended to not just inform your thinking, but also to reform – and to re-form – that thinking.  It is designed to challenge your beliefs, to change the way you see production.

Pipeline workshops™ are intended to test your understanding of how homebuilding production systems work and how daily operating decisions drive business outcomes.

We constantly remind builders: there is a big difference – a big difference – between being in the home building business, and being in the business of building homes.

You have to come to a Pipeline workshop™ prepared for what is going to be thrown at you.

Here are examples of what we are talking about:  the RB Builders: Lessons from the Pipeline© business case, which is revised every year, requires the use of financial tools like Breakeven Analysis (using a variable costing approach, using Cost-Volume-Profit Analysis), the DuPont identity (for determining ROA), and the Cost of Variation.  It requires an understanding of production physics, including Little’s Law* and the Law of Variability Buffering.  It requires the application of a combination of improvement methodologies (Theory of Constraints, Lean Production, Six Sigma).

You can read the book.  The Pipeline: A Picture of Homebuilding Production, Second Edition© is always carried in stock on amazon.com;  it is also available (print-on-demand) directly from the publisher’s bookstore (virtualbookworm.com).

If you want it all handed to you, don’t bother to attend.  If all you care about is binder material you can underline and put on your bookshelf, don’t waste your time.  If you aren’t willing to own what you take away from it, a Pipeline workshop™ is not for you.  If you believe improving the margin side of Return on Assets is the only game in town, a Pipeline workshop™ is about a different game.

On the other hand, if you are determined to create sustainable competitive separation, by learning to thrive on the velocity side of Return on Assets®, by learning to excel at a discipline that other builders find too difficult, too rigorous, too daunting, then a Pipeline workshop™ is precisely the right place for you to be.

Come.  Participate.  Learn.

 

Pipeline workshop™ No. 12 will be held October 17-18, 2019, at the Ponte Vedra Inn and Club, in Ponte Vedra Beach, Florida.  The cost is $895.00;  the cost during early registration, open through August 6, 2019, is $750.00;  for team pricing, ask (flgroves@saiconsulting.com).

Sponsored by Specitup.

For more details:  www.buildervelocity.com

*We will entice you a bit with Little’s Law.  Consider this scenario:  C/T=120 days;  WIP=80;  Closings=240.  Little’s Law says:  CT = (WIP ÷ C) x 360;  WIP = (CT x C) ÷ 360;  C = (WIP ÷ CT) x 360.  Therefore:  CT = (80 ÷ 240) x 360 = 120 days;  WIP = (120 x 240) ÷ 360 = 80 units;  C = (80 ÷ 120) x 360 = 240 closings.

 

Leave a Reply

Your email address will not be published. Required fields are marked *

*