Pipeline Workshops™: Improvements to the Game™

“Pipeline games™ were a brilliant way to demonstrate and drive home the significance of cycle time improvements and improving trade partner efficiencies on ROA and Net Income.”  (Keith Porterfield, COO, Goodall Homes, Gallatin, TN)

“Pipeline games™ are a very innovative way to demonstrate the critical nature and relationship between cycle time, inventory turn, margin, and return on assets.”  (Vishaal Gupta, President, Park Square Homes, Orlando, FL)

Simulating production principles is a big part of every Pipeline workshop™.  We hear, over-and-over, that the opportunity to simulate production in a progressive series of scenarios is what enables builders to actually “see” production, to see production principles in action.  Because it is both a production simulator and a business game, the Pipeline game™ is what makes Pipeline workshops™ so intense, so interactive, and so competitive.

The Pipeline game™ has always been a tremendous tool for teaching both production and business principles, but we are never content.  We constantly improve it, introducing significant changes over the past five years that make it even more effective.

One of the earlier changes was to shorten the game, so that we could run more production scenarios in the same amount of time, and so that each operating decision became more consequential.  Another change, designed to make the game more realistic, was to have it depict the outsourced nature of homebuilding production as it is universally and currently performed.

That later change begs a deeper dive.

In the earliest version of the game, the resources that did the work reflected both capacity and the cost of that capacity;  the problem was, that arrangement more reflected a manufacturing operation than a homebuilding operation.  In order to realistically depict the current, outsourced nature of homebuilding production, capacity has to be separated from cost.

Why?  Because, the external resources that determine production capacity are a part of Cost of Sales (making them a direct, variable cost);  Cost of Sales is a measure of product cost, not capacity cost;  Operating Expense (the indirect, non-variable cost of internal resources) is what determines capacity cost.

Using the resources to reflect both capacity and cost required us to essentially disregard Revenue and Cost of Sales, and treat Throughput  (i.e., Gross Income) as Revenue.  In the improved version of the Pipeline game™, we restored Revenue and Cost of Sales to the picture, making Throughput (i.e., Gross Income) the residual;  in effect, we now account for the margin side of Return on Assets.

Because they do the work (not simply manage it), the external resources in a Pipeline game™ now define the production system’s capacity, and the cost of those resources is reflected in Cost of Sales, stipulated as a percentage of Revenue;  as it relates to Revenue, they are a direct, variable cost associated with the construction of a home.  Operating Expense is now an imposed cost, reflecting the budgeted cost of the internal capacity required to manage work-in-process;  that makes Operating Expense an indirect, non-variable cost, as it relates to Revenue, and the completions and closings that produce it.

This represents a significant stride in reconciling Revenue, Cost of Sales, Throughput, and Gross Income, making operating decisions easier to connect to financial outcomes.  The result is a production simulator and business game that is vastly more reflective of a homebuilding operation, with lessons that are now much easier for builders to understand.

This change continues to pay-off;  the Pipeline games™ keep getting better and better.

Being introduced at the upcoming Pipeline workshop™, one of the Pipeline games™ will compare the current, accepted growth and operations strategy (a completely outsourced building model) to a radically different growth and operations strategy (a completely integrated building model), in order to explore the difference between a strategy based on a broader, shallower footprint and one based on a narrower, deeper footprint.

 

Come.  Participate.  Learn.

The next Pipeline workshop™ will be held September 26-27, 2018, at the Ponte Vedra Inn and Club, in Ponte Vedra Beach, Florida.  Cost is $895.00;  for team pricing, inquire here:  flgroves@saiconsulting.com

Delivered by SAI Consulting and Continuum Advisory Group.

Sponsored by BUILDER, BuilderMT, and Specitup.

Details:  www.buildervelocity.com